Find licensed, state-certified asbestos abatement contractors serving Upper Arlington. Understand local regulations, typical costs, and what to expect.
Get Free Contractor QuotesRegulations change. Always verify current requirements with the licensing body and notifying agency before beginning any asbestos project.
Cost ranges are sourced from HomeAdvisor national cost data and adjusted for Ohio market conditions.
| Project Type | Typical Range |
|---|---|
| Popcorn / Acoustic Ceiling Texture (per sq ft) | $3–$7 |
| Floor Tile & Adhesive (per sq ft) | $5–$12 |
| Pipe Insulation (per linear foot) | $10–$20 |
| HVAC / Duct Insulation | $500–$4,000 |
| Roofing (per sq ft) | $5–$15 |
| Full Home Abatement | $1,500–$10,000 |
Note: Ohio abatement costs are near national averages; Boardman/Mahoning County and Stow/Summit County are competitive mid-Ohio markets; Columbus metro (Upper Arlington) benefits from a larger contractor base. Source: HomeAdvisor. Get free quotes for exact Upper Arlington pricing.
Upper Arlington has approximately 58% of its housing stock built before 1980 (median year built: 1964), when asbestos was widely used. Common Ohio housing types include: mid-century ranch homes and split-levels, older brick bungalows and colonials, post-war residential subdivisions, older commercial and industrial buildings.
9×9 and 12×12 vinyl tiles installed before 1980 frequently contain asbestos; the black mastic adhesive beneath them often does too.
Corrugated wrap on steam and hot-water pipes, boiler jackets, and elbow fittings in pre-1980 homes and commercial buildings.
Spray-applied texture and "popcorn" acoustic ceiling products applied before 1978 commonly contain asbestos.
Duct wrap, duct tape, vibration collars, and HVAC insulation in pre-1980 systems often contain asbestos-containing materials (ACM).
Pre-1977 joint compound (drywall mud) and plaster products frequently contain asbestos; sanding disturbs fibers most.
Asbestos-cement shingles, transite siding, and roofing felt were common in residential and commercial construction through the 1970s.
A state-accredited asbestos inspector surveys the property and collects bulk samples for laboratory analysis. Do not disturb suspected ACM before inspection.
Before work begins, the licensed contractor submits notification to Ohio Environmental Protection Agency (Ohio EPA), Division of Air Pollution Control at least 10 working days in advance for qualifying renovation or demolition projects (40 CFR Part 61 Subpart M; Ohio Admin. Code 3745-20 (Asbestos NESHAP)).
Workers erect negative-pressure containment, wear HEPA-filtered respirators (NIOSH-approved half-face or full-face APF ≥ 10), and use wet methods to suppress fiber release during removal.
Aggressive air sampling and phase-contrast microscopy (PCM) or transmission electron microscopy (TEM) clearance testing confirms the area meets safe fiber levels before containment is removed.
ACM waste is double-bagged in 6-mil poly bags, labeled per EPA/DOT requirements, and transported to a licensed hazardous waste disposal facility.
Yes. Ohio requires Ohio Asbestos Abatement Contractor License (Ohio Department of Commerce); asbestos supervisor, worker, inspector, project designer, and management planner certifications required under Ohio Admin. Code 3745-20. Unlicensed removal violates state law and can result in significant fines. Always verify contractor license status with Ohio Environmental Protection Agency (Ohio EPA), Division of Air Pollution Control, Asbestos Program.
Small projects (floor tile, ceiling texture) typically take 1–3 days. Full home abatement may take 1–2 weeks. Factor in the 10-working-day advance notification requirement before work can begin.
Typical full-home abatement in Upper Arlington ranges from $1,500 to $10,000. Costs vary by scope, ACM type, and site access. Get multiple quotes from licensed contractors for accurate Upper Arlington pricing.
Homeowners may collect samples, but samples must be analyzed by an accredited laboratory (NVLAP-accredited). For pre-renovation surveys, Ohio may require a state-accredited inspector. Do not sand, drill, or disturb suspected ACM before testing.
Encapsulation (applying a sealant or covering ACM in place) is permitted in some situations where the material is in good condition and won't be disturbed. A licensed inspector must assess whether encapsulation is appropriate; notification requirements still apply for qualifying projects.