Is There Asbestos in Your Orland Park Home?
Homes and buildings built before 1980 are most at risk. Approximately 60% of Orland Park's housing stock predates 1980. Common locations include:
- Popcorn/textured ceilings (common in homes built 1960–1978)
- Floor tiles and tile adhesive (9" vinyl floor tiles are a major red flag)
- Pipe insulation and duct wrap in older HVAC systems
- Attic insulation, particularly vermiculite (gray, pebble-like material from Libby, MT)
- Roof shingles and siding on pre-1980 construction
- Drywall joint compound and textured paint used before 1980
- Orland Park is a rapidly growing Cook/Will County suburb; while much of its stock is newer, older neighborhoods developed in the 1960s–1970s contain homes with asbestos in floor tile adhesive and duct wrap.
- Illinois IDPH contractor licensing and IEPA 10-day notification required.
- Commercial buildings along LaGrange Road and 159th Street corridors from the 1970s–1980s may contain asbestos in ceiling tiles and HVAC insulation.
Illinois Licensing Requirements
You must hire a licensed, accredited contractor for any qualifying asbestos project in Illinois. Fines for unlicensed work can exceed $25,000 per violation.
Licensing Authority
Illinois Department of Public Health (IDPH), Division of Environmental Health, Asbestos Abatement Program; Illinois EPA enforces NESHAP
dph.illinois.govRequired Credentials
Illinois Asbestos Abatement Contractor License (IDPH); asbestos supervisor, worker, inspector, project designer, management planner, project manager certifications required
77 Ill. Adm. Code 855 (Asbestos Abatement) and Code 856 (Asbestos Inspector/Management Planner)Notification Requirement
Notify Illinois Environmental Protection Agency (IEPA), Bureau of Air at least 10 working days before any qualifying renovation or demolition project begins. This is mandatory — not optional.
40 CFR Part 61 Subpart MLocal Rules (Orland Park)
Federal NESHAP 40 CFR Part 61 Subpart M baseline applies; notify Illinois Environmental Protection Agency (IEPA), Bureau of Air at least 10 working days before work begins.
Cost Ranges for Orland Park Homeowners
All figures are ranges — get at least three written quotes before hiring. Costs vary by material type, square footage, and local labor rates.
Always obtain at least three written quotes. Costs do not include testing ($250–$850 for inspector survey) or disposal fees.
Questions to Ask Before Hiring in Orland Park
A legitimate contractor will answer all of these without hesitation.