Is There Asbestos in Your Houston Home?
Homes and buildings built before 1980 are most at risk. Common locations include:
- Popcorn/textured ceilings (common in Houston-area homes built 1960–1978)
- Floor tiles and tile adhesive (9" vinyl floor tiles are a major red flag)
- Pipe insulation and duct wrap in older HVAC systems
- Attic insulation, particularly vermiculite (gray, pebble-like material)
- Roof shingles and siding on pre-1980 constructions
- Drywall joint compound and textured paint
Asbestos Removal Costs in Houston (2026)
Prices from licensed Houston-area contractors. Ranges reflect project size and material type.
Texas & Houston Asbestos Regulations
What the law requires before, during, and after removal work in Houston.
Federal EPA Requirements
All asbestos removal projects must comply with the National Emission Standards for Hazardous Air Pollutants (NESHAP). Contractors must provide written notification to the EPA before demolition or renovation of regulated facilities.
40 CFR Part 61 Subpart MTexas Licensing (DSHS)
Texas asbestos work is regulated by the Texas Department of State Health Services (DSHS), Asbestos Program. State-specific licensing requirements apply — confirm current license categories and worker certifications directly with the agency before hiring.
State-specific licensing requirements applyOSHA Worker Safety
Workers must receive proper training and respiratory protection. Permissible Exposure Limit (PEL) is 0.1 fibers per cubic centimeter of air over an 8-hour period.
29 CFR 1926.1101Waste Disposal
Asbestos waste must be wetted, double-bagged in 6-mil poly bags, labeled, and disposed of at an approved Texas Commission on Environmental Quality (TCEQ) landfill.
TCEQ 30 TAC Chapter 330What the Removal Process Looks Like
A typical Houston asbestos project from start to finish.
Initial Inspection & Testing
A certified inspector collects bulk samples and sends them to an accredited lab. Results come back in 24–72 hours. You receive a written report confirming which materials contain asbestos.
Contractor Selection & Permitting
For commercial projects, your contractor must notify Texas Department of State Health Services (DSHS) and file required paperwork before work begins (typically 10 working days lead time under federal NESHAP). Residential rules vary; reputable contractors follow the same protocol.
Containment Setup
Workers seal off the work area with 6-mil polyethylene sheeting, create a negative air pressure environment, and set up a decontamination unit. HVAC systems are disabled to prevent fiber spread.
Removal & Disposal
Materials are wetted before removal to suppress fibers, carefully removed, double-bagged, and transported to a permitted asbestos-receiving landfill. Workers wear full PPE including P100 respirators.
Clearance Air Testing
After removal, an independent industrial hygienist conducts final air testing. The area is not cleared for re-occupancy until fiber counts fall below 0.01 f/cc.